Cycleroute AIDA - Alta Italia da...

Pledge
Icon close white 3f944adb9c9650063a8c1683e1d9c8ddfee10ac09af1a1b67c773197c39393aa
Loading pp black 533b87cfd338eef8adc058952b8f834fb495f7d439c68cc5c683336f8b4b639b
From Turin to Trieste for 900 Km
Travels, Civic, Green
Widget
Copy and paste the code below on your site or blog
Text copied
Shortlink
Text copied

Cycleroute AIDA - Alta Italia da Attraversare

More than 8.000 signals from France to Slovenia for 900 Km: give us a hand, adopt 1 kilometer!

30,240€
-11 Days
100%
30,000€
Pledge

Keep it all This project will receive all funds raised even if it does not reach its goal

Keep it all

Cycleroute AIDA - Alta Italia da Attraversare

More than 8.000 signals from France to Slovenia for 900 Km: give us a hand, adopt 1 kilometer!

30,240€
-11 Days
100%
30,000€
Pledge

Keep it all This project will receive all funds raised even if it does not reach its goal

Keep it all

Adopt 1KM of AIDA, the cycleroute which links Northern Italy

Aida is music, dream, movimento. It leads yo for 900 Km from Moncenisio to Trieste, from France to Istria.

It takes you for 600 miles from Moncenisio to Trieste; from France to Istria. 

Aida is a FIAB Onlus’ project and part of Bicitalia Network. It aims to link Northern Italy cities like Turin, Milan, Verona, Venice. Almost 50% of the cycle route is already existing: we just need to unify it. 

Our mission is: 

  • To unify instead of invent new infrastructures. 
  • To satisfy both cycle tourism and local mobility, crossing highly populated cities 
  • To enlarge Italian National cycle network, linking UNESCO sites. 

Help us realizing this dream: adopt  on KM of Cycle-route AIDA!

The more we raise compared to 30.000€,  more KM will be signalled:

  • from 0 to 5.000€  all the communication and signal materials will be created
  • from 5.000€ to 10.000€ we will signal the first 50 km  (Desenzano - Verona)
  • from 10.000€ to 15.000€ we will signal the first 100 km  (Brescia - Vicenza)
  • from 15.000€ to 20.000€ we will signal the first 300 km (Milano - Padova)
  • from 20.000€ to 25.000€ we will signal the first 600 km (Torino - Treviso)
  • from 25.000€ to  30.000€ we will signal all the 900km (Susa - Trieste)

Nevertheless the results of this year, we will proceed next year to launch another campaign in order to complete the work!


What does it mean to adopt one kilometer of AIDA?

Adopting 1 KM of AIDA means helping us to achieve those actions:

-  To track all the route with a GOS and GARMIN VIRB Cam, in order to track and report critical points.

- To print more than 8.000 signals (adhesive), water and sun proff

- To leave (when it is phisically possible) on the route three kinds of signal, in two versions for ride direction. 

- To maintain the signals updated in the next three years

-  To sustain the Cycleroute Projects on a communication and political stand point, making a positive lobby on the Italian institutions impacted by AIDA

Who is behind AIDA Project?

AIDA commitee  is made of volunteers belonging to FIAB Onlus.

 FIAB (Federazione Italiana Ambiente e Bicicletta) is a national association with more than 18,000 associates. It works since 1989  in order to transform Italy into a cycling country,

FIAB is partner of Italian Ministry of Transports and it is responsible of Progetto Bicitalia, which tracks and promotes national cycle-routes since 1999.

FIAB is an ECF member (European Cyclist Federation),and it collaborates to the Eurovelo project

1572953544104411 logofiab 2019 col var01oriz

Project created by

FIAB ONLUS

FIAB (Federazione Italiana Ambiente e Bicicletta) is a national association with more than 18,000 associates. It works since 1989  in order to transform Italy into a cycling country,

FIAB is partner of Italian Ministry of Transports and it is responsible of Progetto Bicitalia, which tracks national cycle-routes since 1999.

FIAB is an ECF member (European Cyclist Federation),and it collaborates to the Eurovelo project

Follow us on

From Turin to Trieste for 900 Km